The Village at Burlingame is a transformative mixed-use development located in downtown Burlingame, California. Completed in 2023, the project delivers 132 affordable rental units, including 77 workforce and 55 senior apartments, addressing the city’s critical housing needs. The development replaces two former public parking lots with a five-story residential building and a five-level parking structure offering 368 spaces, including 24 EV charging stations. A new public park and pedestrian pathways enhance community connectivity and promote walkability. The project’s design integrates modern architecture with the existing urban fabric, fostering a vibrant and inclusive downtown environment.
This initiative represents a successful public-private partnership between the City of Burlingame and Pacific West Communities. The city contributed land and financial support, while the developer managed construction and operations. The project aligns with Burlingame’s General Plan and Housing Element goals, promoting sustainable, transit-oriented development. The inclusion of a state-of-the-art parking facility supports local businesses and reduces traffic congestion. The Village at Burlingame stands as a model for equitable, sustainable urban redevelopment.
Affordable living meets sustainable design in the heart of downtown Burlingame.
The Village at Burlingame was envisioned to address the dual challenges of housing affordability and downtown revitalization. By providing a mix of workforce and senior housing, the project ensures that residents of varying income levels can live near employment centers and essential services. The development promotes a “park once” strategy, encouraging residents and visitors to utilize public transit and pedestrian pathways. This approach supports local businesses and reduces reliance on personal vehicles. The project’s integration of housing, parking, and public spaces exemplifies comprehensive urban planning.
Situated at 150 Park Road, the Village at Burlingame occupies a central location within the city’s downtown corridor. The site was formerly two public parking lots, repurposed to accommodate the new residential and parking structures. The development is within walking distance of the Burlingame Caltrain station, retail shops, restaurants, and community services. Its strategic location enhances accessibility and encourages transit-oriented lifestyles. The project’s design complements the surrounding architecture, maintaining the area’s aesthetic continuity.
Current Status: Fully operational and serving residents and the community.
The Village at Burlingame incorporates sustainable design principles, including energy-efficient building systems, water-conserving fixtures, and the use of durable, low-maintenance materials. The parking structure features 24 Level 2 EV charging stations, supporting the city’s commitment to reducing greenhouse gas emissions. The development’s proximity to public transit and inclusion of pedestrian pathways promote alternative transportation modes. Landscaping with native plants reduces water usage and supports local biodiversity. These features contribute to the project’s long-term environmental resilience.
The Village at Burlingame significantly contributes to the city’s affordable housing stock, providing homes for low- and moderate-income individuals and seniors. The development supports local economic growth by increasing foot traffic to downtown businesses and creating construction and permanent jobs. The new public park and improved pedestrian infrastructure enhance community well-being and social cohesion. By addressing housing needs and promoting sustainable urban living, the project serves as a blueprint for future developments in the region.
Connect with an ACE Quality Control Project Manager to see how our hands-on approach, technical depth, and disciplined oversight set us apart.